If the above conditions are met and the barrier is maintained in its proper position, it will function as intended. Maintaining the barrier in position will involve anchorage as described in other sections of this site. The figure below shows a typical cross-section through a construction site where the disturbed area is likely to cause silt and sediment migration into the waterway. To determine the best distance to place the barrier from the work site, do the following:
- Select the sediment particle size or description that is relavent to the site.
- Enter values for the flow velocity and the barrier depth.
- Click the Length button and the optimum position of the barrier will be displayed.
- This data must be regarded as only a quide since precise measurements cannot be derived from the general information on which the result is based.
Note that the flow rate has a significant effect on size of the settlement area.